常見問題
question
企業(yè)案例
case
聯(lián)系我們
- 聯(lián)系人:濟(jì)南燕翔鐵藝制品有限公司
- 手機(jī):15953126901
- 電話:18615254757
- 郵箱:785385551@qq.com
- 地址:濟(jì)南市天橋區(qū)歷山北路黃臺(tái)不銹鋼市場(chǎng)3區(qū)317
鋼結(jié)構(gòu)安裝前要對(duì)加工構(gòu)件驗(yàn)收檢查
來源:http://www.htegtbn.cn 日期:2022-10-20 發(fā)布人: 瀏覽次數(shù):14次
鋼結(jié)構(gòu)安裝前對(duì)于廠區(qū)進(jìn)場(chǎng)的鋼構(gòu)件不進(jìn)行驗(yàn)收檢查就安裝,是不對(duì)的,雖然構(gòu)件在出廠前雖檢查合格,但在運(yùn)輸、堆放、裝卸、吊放過程中有可能造成構(gòu)件變形、焊縫撕裂、涂層脫落等現(xiàn)象,如不檢查進(jìn)行矯正、修補(bǔ),構(gòu)件就可能不符合驗(yàn)收標(biāo)準(zhǔn)要求,尤其是焊縫被撕裂,安裝后會(huì)導(dǎo)致嚴(yán)重事故。為了減少損失,由此可見,安裝前做好對(duì)構(gòu)件的驗(yàn)收檢查是非常重要的。
Before the installation of steel structures, it is wrong to install the steel members entering the factory without acceptance inspection. Although the members are inspected as qualified before leaving the factory, they may cause deformation, weld tearing, coating peeling and other phenomena in the process of transportation, stacking, loading and unloading, and lifting. If they are not inspected and corrected, the members may not meet the requirements of the acceptance standards, especially the weld tearing, which will lead to serious accidents after installation. In order to reduce losses, it can be seen that it is very important to do a good job of acceptance inspection of components before installation.
所以濟(jì)南輕型鋼結(jié)構(gòu)安裝前對(duì)構(gòu)件重新檢查是很有必要的程序,如發(fā)現(xiàn)有運(yùn)輸、堆放、裝卸、吊放中造成的變形、焊縫撕裂、涂層脫落、碰撞損傷等情況,要及時(shí)矯正、修補(bǔ)。安裝前核對(duì)圖紙也是保證工程順利進(jìn)行的重要因素。
Therefore, it is necessary to recheck the components before the installation of Jinan light steel structure. If any deformation, weld tear, coating peeling, collision damage, etc. caused by transportation, stacking, loading and unloading, and lifting are found, they should be corrected and repaired in time. Checking drawings before installation is also an important factor to ensure the smooth progress of the project.
核對(duì)檢查圖紙也是安裝鋼結(jié)構(gòu)前重要的事項(xiàng)。鋼結(jié)構(gòu)制作安裝前對(duì)鋼結(jié)構(gòu)設(shè)計(jì)圖紙不仔細(xì)審查圖紙。在鋼結(jié)構(gòu)制作安裝中常出現(xiàn):圖紙不齊全,圖面不明確,制作無依據(jù),尺寸錯(cuò)誤多,材料采購困難,施工順序不當(dāng),精度達(dá)不到,配合不協(xié)調(diào)等問題,從而造成停工、返工返修,甚報(bào)廢,影響工期,加大成本,造成浪費(fèi),達(dá)不到設(shè)計(jì)要求。
Checking and checking drawings is also an important matter before installing steel structures. The design drawings of steel structures are not carefully reviewed before the fabrication and installation of steel structures. In the fabrication and installation of steel structures, problems such as incomplete drawings, unclear drawings, no basis for fabrication, many size errors, difficulty in material procurement, improper construction sequence, failure to reach the accuracy, and uncoordinated coordination often occur, which cause stoppage, rework, repair, or even scrapping, affect the construction period, increase costs, cause waste, and fail to meet the design requirements.
安裝鋼結(jié)構(gòu)前需要做好安裝的技術(shù)交底、構(gòu)件的驗(yàn)收檢查、核對(duì)檢查圖紙等相關(guān)的事項(xiàng),以保證工程的順利進(jìn)行,防止出現(xiàn)因?qū)硬幻鞔_或者構(gòu)件受損等影響工程的質(zhì)量。
Before installing the steel structure, it is necessary to do a good job in the technical disclosure of the installation, the acceptance inspection of the components, the check and inspection of the drawings and other related matters to ensure the smooth progress of the project and prevent the quality of the project from being affected due to unclear docking or component damage.
以上就是關(guān)于鋼結(jié)構(gòu)安裝前要對(duì)加工構(gòu)件驗(yàn)收檢查的講解,希望對(duì)您能有所幫助。更多相關(guān)內(nèi)容就來我們網(wǎng)站http://www.htegtbn.cn進(jìn)行咨詢了解吧!
The above is the explanation on the acceptance inspection of processed components before the installation of steel structures. I hope it will be helpful to you. More relevant content will come to our website http://www.htegtbn.cn Consult and understand!