鐵藝護(hù)欄產(chǎn)規(guī)定的安裝與維護(hù)方法
來源:http://www.htegtbn.cn 日期:2022-06-25 發(fā)布人: 瀏覽次數(shù):15次
鐵藝護(hù)欄有多種安裝方法。用戶可根據(jù)使用需要選擇合適的安裝方式。安裝時(shí)注意調(diào)整護(hù)欄高度,做好日常保養(yǎng),避免生銹問題。下面,我們跟隨濟(jì)南鐵藝廠家詳細(xì)了解護(hù)欄的安裝方法。和保養(yǎng)方法。
There are many installation methods for iron guardrails. Users can choose the appropriate installation method according to their needs. During installation, attention shall be paid to adjusting the height of guardrail and daily maintenance to avoid rusting. Next, we will follow the Jinan Tieyi manufacturer to learn more about the installation method of guardrails. And maintenance methods.
濟(jì)南鐵藝護(hù)欄的常規(guī)安裝方法:
Conventional installation method of Jinan Tieyi guardrail:
1:法蘭固定是用膨脹螺栓固定。這種方法需要的工具有:沖擊錘、膨脹螺栓、錘子、扳手、螺絲刀、卷尺等,需要注意水泥地面的平整度,擰緊膨脹螺栓。調(diào)整立柱垂直度時(shí)。
1: The flange is fixed with expansion bolts. The tools required for this method include impact hammer, expansion bolt, hammer, wrench, screwdriver, tape measure, etc. it is necessary to pay attention to the flatness of the cement floor and tighten the expansion bolt. When adjusting the verticality of the column.
2:加長支腿預(yù)埋即立柱挖澆。這種方法所需的工具有:水泥、沙子、石頭等攪拌工具,以及小推車等運(yùn)輸工具。需要注意的是,在澆筑混凝土?xí)r,可以先用石頭或磚塊固定立柱,然后再澆筑混凝土。只有混凝土在開始時(shí)容易移動(dòng)位置。
2: The lengthened outrigger is embedded, i.e. the column is excavated and poured. The tools required for this method include mixing tools such as cement, sand and stone, and transportation tools such as trolleys. It should be noted that when pouring concrete, the columns can be fixed with stones or bricks before pouring concrete. Only concrete is easily moved at the beginning.
3:下預(yù)埋鐵焊接固定。這樣就需要提前安裝預(yù)埋鐵。安裝時(shí),立柱或橫管直接焊接在預(yù)埋貼紙上。這就要求嵌鐵的尺寸和護(hù)欄的尺寸要高度一致。,這種安裝速度比較快,但是這種安裝方式會(huì)在一定程度上損壞漆面,損壞的漆面需要打磨上漆。
3: Lower embedded iron shall be welded and fixed. Thus, the embedded iron shall be installed in advance. During installation, the column or horizontal pipe shall be directly welded on the embedded sticker. This requires that the size of the embedded iron should be consistent with the size of the guardrail., The installation speed is relatively fast, but this installation method will damage the paint surface to a certain extent, and the damaged paint surface needs to be polished and painted.
鐵藝護(hù)欄保養(yǎng)方法:
Maintenance method of Tieyi guardrail:
定期除塵:室外灰塵隨時(shí)間飛揚(yáng)堆積,鐵藝產(chǎn)品上會(huì)落下一層漂浮的灰塵。會(huì)影響鐵藝的顏色,從而導(dǎo)致鐵藝保護(hù)膜的損壞。因此,戶外鐵藝設(shè)施應(yīng)定期擦拭,一般選用柔軟的純棉面料。
Regular dust removal: outdoor dust will accumulate over time, and a layer of floating dust will fall on iron products. It will affect the color of iron art, resulting in damage to the protective film of iron art. Therefore, outdoor iron facilities should be wiped regularly, and soft pure cotton fabrics are generally used.
如果由于缺乏保養(yǎng)或意外導(dǎo)致鐵柵欄局部生銹,要定期用棉布蘸少量防銹油或縫紉機(jī)油擦拭鐵柵欄表面。如果發(fā)現(xiàn)鐵柵欄有銹斑,應(yīng)盡快用棉紗蘸機(jī)油涂抹生銹區(qū)域,以去除銹跡,而不是直接用砂紙等表面粗糙的材料打磨。
If the iron fence is partially rusted due to lack of maintenance or accident, first wipe the iron fence surface regularly with a cotton cloth dipped in a small amount of anti rust oil or sewing oil. If rust spots are found on the iron fence, the rusted area shall be coated with cotton yarn dipped in engine oil as soon as possible to remove the rust, rather than directly polishing with abrasive paper and other rough surface materials.
關(guān)于運(yùn)輸和裝卸:要在出廠前做好包裝,防止在裝卸過程和運(yùn)輸過程中護(hù)欄被磨損。如果在安裝過程中漆面磨損,就會(huì)影響護(hù)欄的美觀。
As for transportation and loading and unloading: first of all, package before leaving the factory to prevent the guardrail from being worn during loading, unloading and transportation. If the paint surface is worn during installation, it will affect the beauty of the guardrail.
濟(jì)南鐵藝護(hù)欄由廠家完成后,要經(jīng)過裝卸運(yùn)輸?shù)焦さ氐倪^程,然后安裝。用戶可根據(jù)實(shí)際情況選擇合適的安裝方式,做好除塵維護(hù)工作。
After Jinan Tieyi guardrail is completed by the manufacturer, it shall be loaded, unloaded and transported to the construction site, and then installed. The user can choose the appropriate installation method according to the actual situation and do a good job in dust removal maintenance.
以上就是問題解答的相關(guān)內(nèi)容了,希望能夠幫助到大家,如對這一問題還存在任何疑問,都?xì)g迎關(guān)注我們網(wǎng)站http://www.htegtbn.cn并咨詢我們的工作人員,將竭誠為您服務(wù)。
The above is the relevant content of the question answer. I hope it can help you. If you still have any questions about this problem, you are welcome to follow our website http://www.htegtbn.cn And consult our staff, will serve you wholeheartedly.